2015
In part one we introduced the concept of the big picture related to water-damaged buildings. We also offered an illustration to show how the occupant of a water-damaged structure often has to cope with medical, emotional, legal, and financial concerns in addition to the technical parts of the situation.
Providing information in an easy-to-understand Q & A format, we will build on the six questions that were addressed previously, relating to the connection between water-damaged buildings and health effects.
In this edition we will start to narrow down the big picture to specific crucial facets, and focus on the primary environmental aspect of dealing with water-damaged buildings: removal of sources of microbial growth.
In a general sense, yes, but the specifics will vary from project to project. Unlike many regulated contaminants such as asbestos and lead, the hazards associated with water-damaged buildings are not necessarily controlled by government rules. Although a small number of states have enacted laws which require mold remediation projects to incorporate certain mandatory steps, most states have not yet moved in that direction. In addition, few, if any, regulations exist that deal with the other types of microbial contaminants that are present in water-damaged buildings.
Despite the mixed up status of the regulatory environment, there is a standard of care that has emerged from professionals involved with such work across the globe. While there is an amazing level of consensus on remediation work practices, the standard of care is constantly evolving because it draws on multiple documents for its basis.
Anyone proposing to do work in a water-damaged building that is occupied by sensitized individuals needs to make sure that they understand the standard of care and are familiar with the key documents that industry experts agree are foundational to the proper understanding of remediation. Some of the primary guidance comes from the EPA, OSHA, IICRC S520, NYC Department of Health, Health Canada, ACGIH, AIHA, and the Texas Department of State Health Services.
When viewed as a whole, the standard of care includes such core elements as:
Generally that is the case. However, the first step is to have the work for such individuals conducted in conformance with the standards that are already in place for the remediation industry. Too often reports of work done in homes and workplaces where occupants are suffering with a biotoxin illness fail to even come close to industry-accepted recommendations. Moldy walls removed without isolation barriers, shop vacs used in place of HEPA vacuums, and remediation horror stories are, unfortunately, quite common.
As noted in the bullet points for question 7, there are a number of important steps that should be taken for all mold remediation projects. These same steps should be followed when dealing with water-damaged materials, even if there is no visible fungal growth, since other microbial contaminants and hidden mold colonies are likely to be encountered any time wet building materials are disturbed. This is especially true for common structural members and finish materials that contain cellulose, such as wooden studs, paper-faced gypsum board, ceiling tiles, OSB sheathing, etc.
Beyond those general considerations, contractors must be meticulous in regards to the quality and integrity of their temporary isolation barriers. Mechanical means of supporting plastic sheeting—such as spring poles and furring strips rather than painter’s tape or duct tape— should be utilized to secure the barriers. While some guidelines allow small amounts of moldy materials to be removed without the use of isolation barriers and negative pressure, projects conducted for sensitized individuals should always segregate the remediation work area from other areas of the structure.
Keeping the work area under negative pressure throughout the removal and cleaning process is also a critical step. Such a process is extremely difficult without a decontamination chamber at the entrance to the work area, which moderates the fluctuations in air pressure that occur when people and materials pass through a single entrance to a work area. Adding an air scrubber—in addition to the HEPA filtered exhaust unit that creates negative pressure—has been shown to keep airborne spore concentrations low during the demolition phase.
The consensus of the guidance documents that form the standard of care is that every project should be evaluated by conducting a thorough visual inspection. If the remediation area doesn’t look clean, it probably isn’t clean. Nevertheless, since much of the contamination being addressed in remediation projects is of microscopic size a visual inspection cannot guarantee that the job was completed properly. Therefore, sampling that can detect particles invisible to the unaided eye should supplement the visual evaluation.
Extensive experience has shown that remediation projects conducted for sensitized individuals should be evaluated using a combination of air samples and surface samples. While the details of the sampling process can vary based on the type of work being conducted, it is absolutely crucial that all parties agree to the endpoints before the work begins. Feel free to contact Wonder Makers for specific recommendations regarding post-remediation evaluation criteria that would be appropriate for any particular type of project.
10 #FAQ About Water-Damaged Buildings–Seeing the Big Picture (Part 2) @moldsensitized http://t.co/rXWrdVO3Zc #mold PLS RT
— Mold Sensitized (@moldsensitized) March 25, 2015